Compliance

Will It Pass Inspection
and Get a Title?

Compliance is configured before you pay, not guessed after delivery. Tell us the destination country and state, and we confirm the sink, voltage, plug standard and paperwork in the written quote.

See the US spec
Four things to check

The questions US buyers ask first

These four areas are where a cheap import usually fails. Here is what we put in writing.

01

VIN & registration

A VIN plate is supplied for registration in the destination country. Certificate of Origin and commercial invoice ship with the unit for customs.

02

US spec & health inspection

US-bound units get a 3+1 sink (50 L fresh / 75 L waste), GFCI protection and 110V / 3.6 kW electrics.

03

Electrical by destination

220V / 7.5 kW, 380V, dual circuit or three-phase, and UK / EU / US / AU plug standards are set per order.

04

Certificates

A 2006/42/EC Machinery Directive attestation, an ISO 9001:2015 quality system at the Xinyang plant and a USPTO-registered BELYOO trademark. Scans are published on this page; the exact document set is confirmed in your written quote.

By destination

One trailer, several legal setups

The body is the same. The water system, electrics and documents follow your market.

  • ✓3+1 compartment sink plus a separate hand sink
  • ✓50 L fresh water / 75 L waste water tanks
  • ✓110V / 3.6 kW with GFCI-protected sockets
  • ✓VIN plate, Certificate of Origin and commercial invoice
  • ✓Lighting, tyres and VIN specified to FMVSS in the written quote
Check my state
  • ✓Double sink, 25 L fresh / 25 L waste as standard
  • ✓220V / 7.5 kW; 380V available on request
  • ✓UK / EU / AU plug standards and frequency set per order
  • ✓2006/42/EC Machinery Directive attestation (valid to 2029)
  • ✓Destination-specific requirements confirmed before payment
Check my country
Before you tow or import

Check these four things on any quote

Our own internal rule says the same: certification and local admission are only confirmed in the written quotation.

FILE

Registration documents

VIN plate, Certificate of Origin and the tyre load label. Confirm the exact document list and issue timing in your quote.

WATER

Sink layout

3+1 for the US (50/75 L), double sink elsewhere (25/25 L). Ask your local health department which applies.

POWER

Load calculation

Add up your equipment before choosing a circuit plan. We size 110V / 3.6 kW or 220V / 7.5 kW to that list.

WEIGHT

Final tow weight

A 4.5 m unit is about 1,400 kg. Confirm final weight, tow rating and axle spec for your configuration.

Certificates & paperwork

What you can actually verify

Every document below is a real scan you can check before you order. Certificate numbers, scope and issue dates are confirmed in the written quote.

✓2006/42/EC attestation✓ISO 9001:2015 · Xinyang plant✓USPTO-registered BELYOO mark✓UL 758 Recognised wiring✓VIN plate✓Certificate of Origin✓Commercial invoice✓GFCI protection✓Written quote lists the scope

Factory & product documents

Component & supplier documents

The Machinery Directive documents above are third-party attestations: the EC Declaration of Conformity is issued by the manufacturer, and the exact document set for your destination is listed in your written quote. The UL, TÜV Rheinland and FCC documents cover individual components or supplier materials, never the whole trailer. We do not claim a DOT certificate — US registration is handled with the VIN plate, lighting, tyres and the documents itemised in your quote.

Not sure what your state requires?

Send us the state and your equipment list. We will confirm the configuration in writing before you pay anything.

Check my requirements