Before You Ask
The questions buyers actually ask before ordering — answered from our written specifications. Anything not listed here is confirmed in your quote.
Get a QuoteTwelve answers, no sales language
If your question needs a drawing, a certificate copy or a load calculation, ask us directly.
What are the real dimensions?
The 4.5 m unit is 4.5 × 2 × 2.35 m with a 1.95 m interior height. Earlier 16.5 ft descriptions were corrected.
Does US$4,400 include freight and tax?
No. Optional equipment, wooden crate packing, freight, destination charges and duties are quoted separately.
Which water tanks come standard?
US 3+1 sink: 50 L fresh / 75 L waste. Other destinations: double sink with 25 L / 25 L.
Is the 3+1 sink required?
It is the US standard we build to. Confirm your county health department requirements before ordering.
Are cabinet doors and cooking equipment included?
The stainless worktop is included; cabinet doors are not. Appliances are quoted item by item.
How long is the warranty?
One year from dispatch. Claims are assessed from photos or video; misuse and transport damage are excluded.
How much does a trailer weigh?
About 1,400 kg for the 4.5 m build. Final weight, tow rating and axle spec depend on your configuration.
How long does production take?
About 30 days. The build schedule starts when the quote is confirmed; shipping time depends on destination.
What do you need for a quote?
Destination country, menu or use, equipment needs and buyer type. Opening date and budget are optional.
Can I check the trailer before it ships?
Yes — visit the plant, appoint a third-party inspector, or request a video walkthrough and test records.
Still have a question?
Send your equipment list or state requirements to an engineer. We reply in English within one business day.
Want to see the factory first?
Fly into Zhengzhou (CGO); we arrange pickup and a plant visit.
Warranty, delivery and payment
The parts that matter once the build starts.
- ✓One year from the date the trailer leaves the factory
- ✓Quality claims assessed from photos or video
- ✓Misuse and transport damage are excluded
- ✓Installation guidance, repair assistance and spare parts
- ✓Service hours: Mon–Fri 09:00–11:55, 13:25–18:00 (UTC+8)
- ✓About 30 days from confirmed deposit to loading
- ✓Weekly progress reports during production
- ✓Foam wrap, wooden crate and container loading in-house
- ✓Dispatch from Qingdao port; freight time depends on destination
- ✓Deposit ratio and payment milestones are confirmed in the written quote
How to reach a real person
English by default. Because of the time difference, price, lead-time and document promises are always confirmed in writing.
Ready for a written quote?
One business day, itemised line by line, with a free 2D layout attached for most enquiries.
Get a Quote & Delivery Plan